Draper ADU builder

ADU builder in Draper, Utah

Cocoon Homes is a Lehi, Utah ADU builder that designs, permits and builds backyard ADUs in Draper — typically $85,000–$200,000 all-in.

Draper allows detached ADUs (D-ADUs) on lots as small as 6,000 sq ft, well under the 11,000 sq ft SB284 requires cities to allow, after easing its rules in November 2024.

Ready to talk? Book a 30-minute call.

Draper ADU rules at a glance

RuleDraper
Detached ADUAllowed (D-ADU); rules eased Nov 2024
Lot minimum6,000 sq ft — already below the state's 11,000
Owner-occupancyRequired — main home OR the ADU
Basement rentalsPermitted
PermitD-ADU permit required (code current through Ord. 1721, Aug 2026)

Last reviewed October 6, 2026 · Official source: Draper City, ADU permits · Draper on our Utah ADU rules tracker

Draper didn't need SB284 to open up: its 6,000 sq ft lot minimum was already well below the state's 11,000. Our tracker doesn't yet carry Draper's size, height, setback or parking numbers for a D-ADU, so we confirm those against Draper's current code (through Ord. 1721) for your lot before design.

Which Cocoon floor plans fit Draper's rules

PlanSizeFits Draper's size rules?Added parking
100 Series studio (home ~$63K)170 sq ftSize limit not on our tracker; confirm with DraperConfirm with Draper
200 Series one-bed retreat (home ~$73K)240 sq ftSize limit not on our tracker; confirm with DraperConfirm with Draper
300 Series one-bedroom, most popular (home ~$84K)300 sq ftSize limit not on our tracker; confirm with DraperConfirm with Draper
400 Series flex (home ~$94K)400 sq ftSize limit not on our tracker; confirm with DraperConfirm with Draper
500 Series two-bedroom (home ~$109K)500 sq ftSize limit not on our tracker; confirm with DraperConfirm with Draper

Most owners go wider or add square footage; custom footprints are available, and we size them to Draper's D-ADU standards before design. What Draper does publish on lot size is generous: a 6,000 sq ft lot qualifies, so many smaller Draper lots that fall short of the state's 11,000 sq ft line still work.

What an ADU costs in Draper

A Cocoon ADU in Draper typically comes in at $85,000–$200,000 all-in. Add 35–50% to the home price for site work, utilities and city costs, with city fees usually $3,500–$9,000. The 300 Series one-bedroom runs around $113,000–$126,000 all-in, against $200,000–$400,000+ for a traditional custom-built ADU. Your site work depends on how far the sewer, water and power have to run, so we price it at the lot check. See Utah ADU costs.

What an ADU rents for in Draper

We don't have a Draper-specific rent figure yet. Wasatch Front ADUs rent for $1,200–$2,500 a month, a typical one-bedroom $1,200–$1,500 (a regional range). At $1,300 a month, a $113,000 build pays back in about 7–7.5 years of gross rent. Draper lets the owner live in either the home or the ADU, so you can rent whichever one you don't live in. More: ADU rental income in Utah.

How we build your ADU in Draper

  1. Lot check. We confirm your lot clears Draper's 6,000 sq ft minimum and check the D-ADU standards in Draper's current code for your lot.
  2. Plan and finishes. Choose a plan or a custom footprint, then pick finishes.
  3. Engineer-stamped plans submitted to Draper. We prepare the permit set and apply for Draper's D-ADU permit.
  4. On-site build. Our Utah crew builds your ADU on a permanent foundation on site.
  5. Final inspection, utilities, keys. We pass Draper's inspections, connect the utilities and give you the keys.

Draper ADU questions

Can I build an ADU in Draper?

Yes. Draper allows detached ADUs, which it calls D-ADUs, on lots of 6,000 sq ft or more, and eased its rules in November 2024. You'll need a D-ADU permit.

Who builds ADUs in Draper?

Cocoon Homes, a Lehi ADU builder, designs, permits and builds detached ADUs in Draper with its own Utah crew, typically $85,000–$200,000 all-in. Our model home in Lehi is open for tours by appointment.

Do I have to live on the property?

Yes. Draper requires the owner to live in either the main home or the ADU.

How much parking does an ADU need in Draper?

Our tracker doesn't list Draper's parking requirement for a detached ADU, so confirm it with Draper's planning staff. All five Cocoon floor plans are under 650 sq ft.

What's the minimum lot size for an ADU in Draper?

6,000 sq ft, well below the 11,000 sq ft SB284 requires cities to allow. Draper also permits basement rentals.

Building in Draper? We'll check your lot first.

Free, and you'll hear from us the same business day.

Ready to talk? Book a 30-minute call.